Fiscal Year Project Description
Cost
Vendor Completed
pics Sand and refinish parquet floors downstairs
$0
undergraduates completed this work
1/24/2004
pics Fix "warped" wall in downstairs living area
$0
several parents donated their time and expertise
2/8/2004
pics Kitchen upgrades - Dishwasher and Fryer
$3,879.00
Hotel and Restaurant Supply
4/26/2004
  Pump grease trap and jet lines of 4" sewer line - provide estimate to replace
$451.01
C&D Plumbing
5/23/2004
pics Replace 140' of 4" sewer line with 6" line. Install two 4" clean outs. Tap 6" connection to manhole. Tamp soil back to ground level.
$2,423.55
C&S Plumbing
5/27/2004
  Cleanup of duct work associated with Unit #3 and installation of new drain pan
$306.02
Cole Refrigeration
7/13/2004
pics Replace carpet in upstairs hallway using tiles
$1482.08
Interface Americas
7/24/2004
pics Summer work party
$554.94
Materials and supplies paid for by MSFiji Inc.
7/24/2004
  Signage in response to insurance inspection and recommendations for fire safety
$36.05
B&I Nameplate Inc.
8/4/2004
         
   
   
2003  
   
 

Multiple issues with HVAC system. Specifically, Unit #3 compressor, breakers and coolant. Recharge Kitchen AC (Unit #6).
Install new condensate pump for Unit #3.

$2414.89 Cole Refrigeration
7/18/2003 to 08/26/2003
  Add flood lights by back stairs/fix light in ice room/fix courtyard lighting
$770.14
Bye Electric
8/8/2003
  Run new circuit to 1500W quartz floodlights and replace 1 light
$413.48
Bye Electric
8/27/2003
  Resolve cable issues regarding signal and connections in rooms - added amplifier and cleaned up coax connections
$267.50
Southern Alarm
10/1/2003